NAME

Worcester Airport Columns

LOCATION

Worcester, MA

DATE

September 2014

CONTRACTOR

Thick Tech Systems and TNT

Albi DriClad

The structural columns of a hangar at the Worcester Airport were too close to the perimeter walls for applying spray fireproofing. Albi DriClad was attached to the wall side of each column using welded stud pins and washers. This provided the required fire rating based on UL Design X313.

Not only is this an ideal solution for this situation, it is also an excellent alternative for a cold weather application. DriClad can be installed prior to erection of the perimeter wall.